Address missing Arcozelo
Market Price
Address missing Arcozelo, Arcozelo, Porto District 4410-402, Portugal
2027
Year Built
EUR
Original Currency
Details:
Highlights:
- Total Rooms: 0
- Cooling: A/C
- Exterior: Double Pane / Storm Windows
- Exterior Living Space: Balcony / Lanai
- General: Laundry Facilities
- Interior: Cedar Closets
- Kitchen Features: Kitchen Facilities
Description:
PRIVILEGE GAIA | GAIA
New project offering the opportunity to live in tranquility and surrounded by nature a short distance from the Ribeira do Espírito Santo walkways and Miramar beach, 10 km from the city of Porto.
The development of 16 villas is located in a consolidated area with all essential services in the surrounding area and access to the main transport links to the city of Porto, both by car and by train.
All villas include a private garden, separate laundry room, and garage. Inside, the rooms are spacious and bright with cozy balconies and large windows that open directly onto the surrounding green spaces.
The construction stands out for its attention to detail, high-quality materials, and environmental and energy efficiency concerns, combining the aesthetic care of contemporary architecture with comfort and durability.
Expected completion date: September 2027
Payment terms:
* 5% on signing the preliminary contract
* 10% at the start of construction
* 10% on completion of the structure
* 10% on completion of the window frames
* 65% on signing the deed
SC
New project offering the opportunity to live in tranquility and surrounded by nature a short distance from the Ribeira do Espírito Santo walkways and Miramar beach, 10 km from the city of Porto.
The development of 16 villas is located in a consolidated area with all essential services in the surrounding area and access to the main transport links to the city of Porto, both by car and by train.
All villas include a private garden, separate laundry room, and garage. Inside, the rooms are spacious and bright with cozy balconies and large windows that open directly onto the surrounding green spaces.
The construction stands out for its attention to detail, high-quality materials, and environmental and energy efficiency concerns, combining the aesthetic care of contemporary architecture with comfort and durability.
Expected completion date: September 2027
Payment terms:
* 5% on signing the preliminary contract
* 10% at the start of construction
* 10% on completion of the structure
* 10% on completion of the window frames
* 65% on signing the deed
SC
#ref:CB20-0023
Listing ID: 28ad1e71-e8f0-4774-8e11-bdd8d5725cc7
Location
Gallery