New Industrial Building in St Boniface Industrial Park

725 Black Diamond Boulevard, Winnipeg, MB Canada

$12.95/sqft/mo

Price

19,800 sqft

Building Size

2023

Year Built

Overview
Building Size
19,800 sqft
Year Built
2023
Description

- Available sizes: +/- 6,600, 13,200, or 19,800 sq. ft.
- Loading doors: 3 Grade and 3 Dock (60k hydraulic docks)
- Ceiling height: 29’ to 30’ clear
- Additional option: Compound Space Available
- Available: March 1, 2024
- Located in St. Boniface Industrial Park, which is the largest industrial park in Eastern Winnipeg
- New construction located just off of Mazenod Road with easy access to Dugald or Plessis Road
- Less than 10 minutes from the Trans-Canada Highway and Perimeter Highway

1 Space Available

Default Space

Available:
Immediately
Sublease:
No
SQFT
6,600
Lease Rate:
$12.95/sqft/mo
Lease Type:
Gross

- Available sizes: +/- 6,600, 13,200, or 19,800 sq. ft.
- Loading doors: 3 Grade and 3 Dock (60k hydraulic docks)
- Ceiling height: 29’ to 30’ clear
- Additional option: Compound Space Available

Documents
Title
ICI-725_Black_Diamond-Brochure.pdf
* Documents permissions are set by the listing owner, request information to access locked documents.

Location
Gallery