1800 South Carpenter

1800 S Carpenter Street, Chicago, IL

$3,800,000

Price

15,132 sqft

Building Size

0.1149 acres

Lot Area

Overview
Building Size
15,132 sqft
Lot Area
0.1149 acres
Occupancy
100%
Units
11
Year Built
1889
Floors
4
Description

1800-1802 South Carpenter Street is a large two-building mixed-use property featuring two (2) high-end retail spaces on the street level and 10 apartments. The buildings total 15,132 square feet and have prime 18th Street frontage and hard corner exposure.

The property underwent a complete gut renovation in 2015-2016 and is home to HaiSous, an award-winning Vietnamese Kitchen and Cà Phê Dá, a café specializing in Vietnamese coffee and street food.

The apartments have a great mix of three, two and one-bedroom units and have been completely renovated with high-end finishes, designer tile, stainless steel appliances, modern cabinetry, dishwashers, in-unit, and/or on-site laundry.

All units have central air and separately metered utilities. Units historically have rented easily and quickly. Garage parking for two (2) vehicles located in the rear of 1802 S Carpenter. The 1800 Building has a full attic and basement, and the 1802 Building features a full basement.

1800-1802 South Carpenter Street is located in the heart of Pilsen at the corner of 18th Street & Carpenter. Located at the focal point of some of Chicago’s hottest restaurants including Pilsen Yars, La Luna, S.K.Y., Dusek’s and Honky Tonk BBQ. The property is home to HaiSous, an award-winning restaurant with a Michelin Bib Gourmand rating.

The location boasts easy access to the CBD, UIC (University of Illinois at Chicago) and the Illinois Medical District. Direct access to multiple Pink Line “El” stops and I-90/94, I-55 and I-290 expressways make it a favored destination of retailers, artists, young professionals and tenants.

Highlights
  • 120' of Frontage on 18th St & 50' of Frontage on Carpenter St
  • Award-Winning Restaurant Tenant | HaiSous
  • Prime 18th Street Corner Location
  • Full Attic | Basement
  • Full Gut Rehab in 2015
  • Two (2) Buildings Combined
Documents

Location
Gallery